Topic
ARIIS
Stories tagged ARIIS

Dubai Metro AI Robot Cuts Track Inspection Time by 75%
Dubai's RTA has deployed ARIIS, an AI-powered robot that inspects Dubai Metro rail tracks overnight using LiDAR, lasers, and 3D cameras — cutting inspection time by 75% and reducing long-term infrastructure costs by up to 25%.
13 Jun 2025

Dubai Metro's AI Robot Cuts Inspection Time by 75%
Dubai Metro's new AI-powered robot, ARIIS, cuts rail inspection time by 75% — from 2,400 man-hours to just 700. Developed by the RTA with Keolis MHI and FMT, the system uses LiDAR, lasers, and 3D cameras to inspect tracks overnight without disrupting passenger services.
12 Jun 2025